GarnetGlobal Training Center العربية

Electrical, Instrumentation & Control

Power System Protection & Relaying

حماية أنظمة القوى والمرحلات

Download brochure (PDF) البروشور بالعربية PDF

Code
GGT-EI-101
Level
Intermediate (practitioner)
Duration
5 or 10 days
Language
English or Arabic
Sessions 2027–2030
16 / 10 cities

Overview

Power System Protection & Relaying turns established good practice into step-by-step methods that participants rehearse in exercises and then apply at work. Power, protection and automation skills for plants, utilities and smart infrastructure. Choose 5 or 10 days, classroom or live online, English or Arabic; organisations can also run it in-house and adapt the examples to their own work.

What you will be able to do

  • Apply the methods and standards of Power System Protection & Relaying to real tasks.
  • Share good practice with your team.
  • Use the right tools, checks and calculations step by step.
  • Diagnose common problems and identify root causes.
  • Interpret data and results correctly and act on them.

Who should attend

Electrical, instrumentation and control engineers, technicians and maintenance leads. Practitioners with one to five years of experience benefit most.

Key topics

  • Power system fundamentals and studies
  • Protection, earthing and safety
  • Control system architecture
  • Field devices and loop checking
  • IEC and IEEE standards
  • Troubleshooting with real fault records

5-day outline

  1. Day 1 Power System Protection & Relaying: principles and standards

    • Protection, earthing and safety
    • Hands-on workshop on a workplace challenge
  2. Day 2 Methods and tools in practice

    • Control system architecture
    • Field devices and loop checking
  3. Day 3 Diagnosis and problem solving

    • IEC and IEEE standards
    • Common mistakes and how to avoid them
  4. Day 4 Quality, safety and documentation

    • Troubleshooting with real fault records
    • Regional and international case studies
  5. Day 5 Workshop, assessment and action plan

    • Power system fundamentals and studies
    • Checklists and templates to take away

10-day outline

  1. Day 1 Power System Protection & Relaying: principles and standards

    • Protection, earthing and safety
    • Hands-on workshop on a workplace challenge
  2. Day 2 Methods and tools in practice

    • Control system architecture
    • Field devices and loop checking
  3. Day 3 Diagnosis and problem solving

    • IEC and IEEE standards
    • Common mistakes and how to avoid them
  4. Day 4 Quality, safety and documentation

    • Troubleshooting with real fault records
    • Regional and international case studies
  5. Day 5 Workshop, assessment and action plan

    • Power system fundamentals and studies
    • Checklists and templates to take away
  6. Day 6 Advanced techniques and specialist practice

    • Complex cases in depth
    • Group discussion and peer review
  7. Day 7 Digital tools, data and automation

    • Analysis tools and software
    • Using AI in this field
  8. Day 8 Benchmarking against international practice

    • Global performance benchmarks
    • Measurement and reporting
  9. Day 9 Capstone project

    • Analyse a real challenge from your organisation
    • Build the solution and implementation plan
  10. Day 10 Presentations, final assessment and certificates

    • Project presentations and review
    • Final exam and certificate award

Certificate

Participants who attend at least 90% of sessions and complete the final assessment receive a certificate of completion stating 35 contact hours (5-day) or 70 contact hours (10-day).

Schedule 2027–2030

DatesFormatCityLanguageFee (USD)Register
11–22 Apr 202710-day classroomKuwait CityArabic8,950Register
13–17 Jun 20275-day classroomJeddahEnglish4,750Register
14–18 Nov 20275-day classroomRiyadhEnglish4,750Register
6–10 Dec 20275-day onlineLive onlineEnglish2,950Register
12–23 Jun 202810-day classroomAmsterdamEnglish8,950Register
21–25 Aug 20285-day classroomAbu DhabiEnglish4,750Register
2–6 Oct 20285-day classroomParisEnglish4,750Register
4–15 Dec 202810-day onlineLive onlineArabic5,450Register
15–19 Jan 20295-day classroomCasablancaEnglish4,750Register
16–27 Apr 202910-day classroomParisEnglish8,950Register
16–20 Jul 20295-day onlineLive onlineEnglish2,950Register
16–20 Sep 20295-day classroomMuscatEnglish4,750Register
18–29 Mar 203010-day classroomViennaEnglish8,950Register
8–12 Jul 20305-day classroomKuala LumpurEnglish4,750Register
18–29 Nov 203010-day onlineLive onlineEnglish5,450Register
9–13 Dec 20305-day classroomParisEnglish4,750Register

Cities for this course

It can also be delivered in-house in any other city. Request in-house

Frequently asked questions

How long is the Power System Protection & Relaying course?

It runs as a 5-day program (35 contact hours) or a 10-day program (70 contact hours) that adds advanced techniques and a capstone project.

Where and when is Power System Protection & Relaying held?

There are 16 public sessions from 2027 to 2030 in cities including Kuwait City, Jeddah, Riyadh, Amsterdam, Abu Dhabi, Paris, plus live online. Next dates: 11–22 Apr 2027 (Kuwait City); 13–17 Jun 2027 (Jeddah); 14–18 Nov 2027 (Riyadh).

How much does the Power System Protection & Relaying course cost?

USD 4,750 for 5 days in a classroom, USD 2,950 for 5 days online, USD 8,950 for 10 days in a classroom and USD 5,450 for 10 days online, per participant excluding VAT.

What level is the Power System Protection & Relaying course?

Level: Intermediate (practitioner). Practitioners with one to five years of experience benefit most.

Is the course available in Arabic and online?

Yes. It is taught in English or Arabic, in a classroom or live online, and materials can be provided in both languages.

Can we run it in-house or customise it?

Yes. We deliver it at your premises in any city and adapt duration, content and examples to your operations.

Do participants receive a certificate?

Yes. Participants who attend at least 90% of sessions and pass the final assessment receive a certificate of completion stating contact hours.